HWY MORMN HLW RD over WATER LYONS BROOK

AT WENDELL TOWN LINE · County 011, Massachusetts · Built 1951 · 2 Lanes · 259 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M280410R8MUNNBI
Year Built
1951
Length
7.4 m (24.3 ft)
Max Span
7.4 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
259
Material
Steel
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$499,000
Total Project Cost
$749,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.