ST 2 MOHAWK TRAIL over COMB RIVER RD&CONN RIV

MM 56.2 ON ST 2 · County 011, Massachusetts · Built 1931 · 2 Lanes · 10,560 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
E100140UCDOTNBI
Year Built
1931
Reconstructed
1992
Length
264 m (866.1 ft)
Max Span
140.2 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
10,560
Material
Steel Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,978,000
Total Project Cost
$38,968,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.