ST 63 BRIDGE ST over WATER MILLERS RIVER

JCT RT 63 & MILLERS RIVER · County 011, Massachusetts · Built 1953 · 2 Lanes · 9,310 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E100020W3DOTNBI
Year Built
1953
Reconstructed
2007
Length
61.3 m (201.1 ft)
Max Span
29.8 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
9,310
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$870,000
Total Project Cost
$1,306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.