ST 63 FEDERAL ST over WATER SAWMILL RIVER

JCT. ST 47 · County 011, Massachusetts · Built 1935 · 2 Lanes · 4,655 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M280330W4DOTNBI
Year Built
1935
Length
10.4 m (34.1 ft)
Max Span
8.5 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
4,655
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,043,000
Total Project Cost
$1,565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.