HWY MAIN ST over WATER SAWMILL RIVER

AT JCT OF GFLD RD · County 011, Massachusetts · Built 1990 · 2 Lanes · 5,043 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M280240MBMUNNBI
Year Built
1990
Length
32.9 m (107.9 ft)
Max Span
32 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,043
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,851,000
Total Project Cost
$2,777,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.