HWY CENTER ST over WATER SAWMILL RIVER

0.2 MI W OF ST 63 · County 011, Massachusetts · Built 1937 · 2 Lanes · 517 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
6
Satisfactory

Bridge Details

Structure #
M280250MCMUNNBI
Year Built
1937
Length
10.6 m (34.8 ft)
Max Span
9.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
517
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,322,000
Total Project Cost
$3,484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.