ST146 NB OFF RAMP over WATER BLACKSTONE RIVER

.1 MILE WEST OF ST 122 · County 027, Massachusetts · Built 1997 · 1 Lanes · 2,169 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M22051AHDDOTNBI
Year Built
1997
Length
185.5 m (608.6 ft)
Max Span
40.5 m
Width
7.6 m (24.9 ft)
Lanes
1
Daily Traffic
2,169
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,417,000
Total Project Cost
$29,126,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.