ST146 SB over WATER BLACKSTONE RIVER

.1 MI W OF ST-122A · County 027, Massachusetts · Built 1998 · 2 Lanes · 21,065 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
M220448HDDOTNBI
Year Built
1998
Length
32.9 m (107.9 ft)
Max Span
32.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
21,065
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,981,000
Total Project Cost
$7,472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.