ST122 A over WATER BLACKSTONE RIVER

.6 MI EAST OF ST 146 · County 027, Massachusetts · Built 2011 · 2 Lanes · 6,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
M220055X3DOTNBI
Year Built
2011
Length
20.5 m (67.3 ft)
Max Span
19.5 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,113,000
Total Project Cost
$1,670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.