HWY ELM ST over COMB BLKSTNE RIV & PWRR

.1 MI.E. OF ST.RTE 146 · County 027, Massachusetts · Built 1982 · 2 Lanes · 8,224 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M22011229DOT634
Year Built
1982
Length
63.6 m (208.7 ft)
Max Span
30 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
8,224
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,682,000
Total Project Cost
$10,024,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.