ST106 EAST ST over WATER CANOE RIVER

0.1 MI. W. OF FRANKLIN ST · County 005, Massachusetts · Built 2007 · 2 Lanes · 34,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
M03012AQ4MUNNBI
Year Built
2007
Length
13.5 m (44.3 ft)
Max Span
12 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
34,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$524,000
Total Project Cost
$787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.