HWY SUMMER ST over WATER BAKER BROOK

.2 MI. E. OF FICHBRG C.L. · County 027, Massachusetts · Built 1900 · 3 Lanes · 6,270 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L170041CJMUNNBI
Year Built
1900
Reconstructed
1930
Length
10.4 m (34.1 ft)
Max Span
4.6 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
6,270
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$670,000