I 495 SB over HWY WOBURN ST

AT I495 & WOBURN ST. · County 017, Massachusetts · Built 2011 · 3 Lanes · 64,355 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L15084BA3DOTNBI
Year Built
2011
Length
22.9 m (75.1 ft)
Max Span
21.3 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
64,355
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$588,000
Total Project Cost
$883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.