I 495 NB over RR MBTA/BMRR

50 FT S OF WOBURN ST EXIT · County 017, Massachusetts · Built 2011 · 3 Lanes · 61,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
L15083BA0DOTNBI
Year Built
2011
Length
26.8 m (87.9 ft)
Max Span
23.7 m
Width
19.5 m (64 ft)
Lanes
3
Daily Traffic
61,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$337,000
Total Project Cost
$506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.