I 495 NB over WATER CONCORD RIVER

3.2KM SOUTH OF RT 38 · County 017, Massachusetts · Built 2011 · 3 Lanes · 61,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
L15082AQCDOTNBI
Year Built
2011
Length
56.9 m (186.7 ft)
Max Span
54.9 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
61,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,777,000
Total Project Cost
$2,666,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.