HWY YMCA DR over COMB MBTA/BMRR & DRIVE

0.1 MI SW RT 3A & HALE ST · County 017, Massachusetts · Built 1892 · 2 Lanes · 9,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L150082N3DOT634
Year Built
1892
Reconstructed
1997
Length
49.7 m (163.1 ft)
Max Span
21.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,350,000
Total Project Cost
$5,026,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.