ST 3 A/GORHAM ST over WATER RIVER MEADOW BROOK

300 YDS SO LWLL CONNCTR · County 017, Massachusetts · Built 1960 · 2 Lanes · 14,012 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
L150392DJDOTNBI
Year Built
1960
Length
12.5 m (41 ft)
Max Span
12.1 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
14,012
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,961,000
Total Project Cost
$4,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.