HWY THORNDIKE ST over WATER PAWTUCKET CANAL

AT PAWTUCKET & WESTERN CA · County 017, Massachusetts · Built 1986 · 6 Lanes · 30,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
L1505387LMUNNBI
Year Built
1986
Reconstructed
2023
Length
36.3 m (119.1 ft)
Max Span
12.2 m
Width
34.3 m (112.5 ft)
Lanes
6
Daily Traffic
30,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.