ST 2 A/ST110/AYER over RR MBTA/BMRR

1.75 MI NW OF I-495 · County 017, Massachusetts · Built 1975 · 2 Lanes · 12,797 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L1301126NDOTNBI
Year Built
1975
Length
28 m (91.9 ft)
Max Span
26.8 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
12,797
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$656,000
Total Project Cost
$985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.