ST122 A/MAIN ST over WATER ASNEBUMSKIT BROOK

500 FT E OF CAUSEWAY ST · County 027, Massachusetts · Built 1948 · 2 Lanes · 13,591 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H180151YPDOTNBI
Year Built
1948
Reconstructed
1986
Length
12.2 m (40 ft)
Max Span
10.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
13,591
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,233,000
Total Project Cost
$1,850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.