ST122 A/MAIN ST over RR PWRR

.3 MI N OF JCT RTE 31 · County 027, Massachusetts · Built 1900 · 2 Lanes · 20,712 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H18003224DOT634
Year Built
1900
Reconstructed
1949
Length
20.1 m (65.9 ft)
Max Span
18.6 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
20,712
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,059,000
Total Project Cost
$3,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.