HWY PRINCETON ST over WATER ASNEBUMSKIT BROOK

0.4 MI N OF ST-122A · County 027, Massachusetts · Built 1954 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H180121FVMUNNBI
Year Built
1954
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$761,000
Total Project Cost
$1,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.