HWY N CROSS RD over WATER DRY BROOK

0.1 MI W OF BOYLE RD · County 011, Massachusetts · Built 1940 · 2 Lanes · 1,552 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G040110PYMUNNBI
Year Built
1940
Length
7.7 m (25.3 ft)
Max Span
6.8 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
1,552
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$374,000
Total Project Cost
$562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.