I 91 SB over HWY RIVER ST

MM 49.7 ON I-91 SB · County 011, Massachusetts · Built 1960 · 2 Lanes · 10,562 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B100210WWDOTNBI
Year Built
1960
Reconstructed
1977
Length
50 m (164 ft)
Max Span
20.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
10,562
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,193,000
Total Project Cost
$3,290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.