I 91 SB over WATER FALL RIVER

MM 49.9 ON I-91 SB · County 011, Massachusetts · Built 1960 · 2 Lanes · 10,459 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B100200WYDOTNBI
Year Built
1960
Reconstructed
1978
Length
63.6 m (208.7 ft)
Max Span
26.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
10,459
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,734,000
Total Project Cost
$8,602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.