HWY INNOVATION W over ST 24 NB & SB

1.4 MILES NORTH OF EXIT 8 · County 005, Massachusetts · Built 2011 · 5 Lanes · 3,491 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
F09023AKYDOTNBI
Year Built
2011
Length
57.9 m (190 ft)
Max Span
33.2 m
Width
29.9 m (98.1 ft)
Lanes
5
Daily Traffic
3,491
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,350,000
Total Project Cost
$3,526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.