HWY W CENTRAL ST over WATER MINE BROOK

@ 860 W CENTRAL ST · County 021, Massachusetts · Built 1850 · 2 Lanes · 5,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F080177W3DOTNBI
Year Built
1850
Reconstructed
1928
Length
6.9 m (22.6 ft)
Max Span
2.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,200
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$666,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.