ST140 W CENTRAL ST over I 495

3 MI S OF ST-126 · County 021, Massachusetts · Built 2006 · 6 Lanes · 98,432 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
F08026ANWDOTNBI
Year Built
2006
Length
71.2 m (233.6 ft)
Max Span
35.4 m
Width
32.5 m (106.6 ft)
Lanes
6
Daily Traffic
98,432
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,683,000
Total Project Cost
$2,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.