HWY HIGH ST over WATER CHARLES RIVER

0.8 MI E. OF RTE. 126 · County 021, Massachusetts · Built 2000 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B06003AVRMUNNBI
Year Built
2000
Length
10.7 m (35.1 ft)
Max Span
8.5 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,234,000
Total Project Cost
$1,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.