ST126 HARTFORD AVE over I 495 SB

1MI.S.MEDWAY TWN LN · County 021, Massachusetts · Built 1966 · 4 Lanes · 20,192 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B060202AGDOTNBI
Year Built
1966
Length
36.9 m (121.1 ft)
Max Span
36 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
20,192
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,892,000
Total Project Cost
$5,839,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.