I 90 over RR CSX

.3 MI. W. OF MDC RES · County 017, Massachusetts · Built 1957 · 6 Lanes · 114,872 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
F070444PKDOTNBI
Year Built
1957
Length
17.7 m (58.1 ft)
Max Span
8.8 m
Width
45 m (147.6 ft)
Lanes
6
Daily Traffic
114,872
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,259,000
Total Project Cost
$7,889,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.