ST 9 WORCESTER RD over WATER RESERVOIR OUTLET

.5 MI. WEST OF TEMPLE ST · County 017, Massachusetts · Built 2016 · 4 Lanes · 41,604 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
F07001BM6DOTNBI
Year Built
2016
Length
31.2 m (102.4 ft)
Max Span
29.1 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
41,604
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$898,000
Total Project Cost
$1,348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.