HWY CROSSNG BLVD over COMB ST 9 & CSX

.5 MI. W. OF MASS PIKE · County 017, Massachusetts · Built 1989 · 4 Lanes · 11,379 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F07067A4LDOTNBI
Year Built
1989
Length
66.5 m (218.2 ft)
Max Span
29.8 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
11,379
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,324,000
Total Project Cost
$7,987,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.