HWY HOLIDY CTTG over WATER WAHCONAH FALLS BRK

200 FT WEST OF RTE 9 · County 003, Massachusetts · Built 1990 · 1 Lanes · 129 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D01011046MUNNBI
Year Built
1990
Length
20.1 m (65.9 ft)
Max Span
17.7 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
129
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,739,000
Total Project Cost
$4,109,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.