ST 9 /ST8A/NORTH over WATER WAHCONAH FALLS BRK

1.8 MI W OF WINDSOR TL · County 003, Massachusetts · Built 1930 · 2 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
D010100B7DOTNBI
Year Built
1930
Reconstructed
1955
Length
21.8 m (71.5 ft)
Max Span
9.4 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
9,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,286,000
Total Project Cost
$3,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.