HWY E HOUSATONIC over WATER E BR HOUSATONIC R

BETWEEN EAST ST & ROUTE 8 · County 003, Massachusetts · Built 1941 · 2 Lanes · 7,198 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D0100800TMUNNBI
Year Built
1941
Length
25.6 m (84 ft)
Max Span
16.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
7,198
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,077,000
Total Project Cost
$3,116,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.