GOODNOW ROAD over PRIEST BROOK

16.09 KM N OF GARDNER · County 027, Massachusetts · Built 1937 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPNEDMA2510017
Year Built
1937
Reconstructed
1991
Length
7.3 m (24 ft)
Max Span
6.4 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Slab
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$16,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.