MIDDLE ROAD over PRIEST BROOK

16.09 KM N OF GARDNER · County 027, Massachusetts · Built 1910 · 1 Lanes · 2 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPNEDMA2510013
Year Built
1910
Reconstructed
1979
Length
7.8 m (25.6 ft)
Max Span
7.3 m
Width
3.5 m (11.5 ft)
Lanes
1
Daily Traffic
2
Material
Prestressed Concrete
Design
Slab
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.