HWY SAND MILL RD over WATER DRY BROOK

.2 MI SOUTH OF RTE 116 · County 003, Massachusetts · Built 1939 · 2 Lanes · 259 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C1000203GMUNNBI
Year Built
1939
Length
14.7 m (48.2 ft)
Max Span
12.6 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
259
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$682,000
Total Project Cost
$1,024,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.