HWY SAND MILL RD over WATER DRY BROOK

.4 MI S OF ROUTE 116 · County 003, Massachusetts · Built 1939 · 2 Lanes · 517 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
C1000303HMUNNBI
Year Built
1939
Length
13 m (42.7 ft)
Max Span
12.1 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
517
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$637,000
Total Project Cost
$956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.