ST 8 GROVE ST over COMB HOOSIC R & ASHWLLT
.2 MI NORTH OF QUALITY ST · County 003, Massachusetts · Built 1951 · 2 Lanes · 13,060 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.608319, -73.131303
This bridge is in worse condition than 64% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 75 years old.
Nearby Bridges
HWY S WILLOW ST over WATER HOOSIC RIVER
Built 1951
ST 8 COMMRCIAL ST over WATER HOOSIC RIVER
Built 1886
HWY LEONARD ST over WATER DRY BROOK
Built 2008
HWY ELM ST over OTHER ASHUWILLTICOOK RT
Built 1921
ST 8 COMMRCIAL ST over WATER HOOSIC RIVER
Built 1948
HWY RIVER ST over WATER HOOSIC RIVER
Built 1939
HWY WEST RD over WATER PECKS BROOK
Built 1976
ST 8 CENTER ST over WATER HOOSIC RIVER
Built 1937
HWY PLEASANT ST over WATER HOOSIC RIVER
Built 1957
HWY HARBOR RD over WATER HOOSIC RIVER
Built 2011
Bridge Details
- Structure #
- A040010D8DOT634
- Year Built
- 1951
- Length
- 76.5 m (251 ft)
- Max Span
- 38.6 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 13,060
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,699,000
- Total Project Cost
- $11,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.