ST 2 over COMB ST112 & DEERFLD R

.1M W JCT ST 112 NO. · County 011, Massachusetts · Built 1954 · 2 Lanes · 10,562 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B280320JCDOTNBI
Year Built
1954
Reconstructed
2014
Length
179.8 m (589.9 ft)
Max Span
53.3 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
10,562
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,945,000
Total Project Cost
$25,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.