ST 2 A/BRIDGE ST over WATER DEERFIELD RIVER

AT BUCKLAND-SHELBRNE T.L. · County 011, Massachusetts · Built 1890 · 2 Lanes · 5,950 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
B280220KUDOTNBI
Year Built
1890
Reconstructed
1994
Length
96.3 m (315.9 ft)
Max Span
31.3 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
5,950
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,387,000
Total Project Cost
$18,581,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.