ST112 over COMB ST 2 & PARR

@ JCT ST 2/ ST 112 399.88 · County 011, Massachusetts · Built 1997 · 2 Lanes · 3,879 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B28003ACFDOT634
Year Built
1997
Length
48.7 m (159.8 ft)
Max Span
26.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
3,879
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,283,000
Total Project Cost
$4,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.