HWY JW MAHAR HWY over RR BCRR SPUR ABAN

.32 KM S OF PEARL ST. · County 021, Massachusetts · Built 1850 · 4 Lanes · 23,405 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B2106836VDOT634
Year Built
1850
Reconstructed
1982
Length
10.4 m (34.1 ft)
Max Span
9.4 m
Width
19.8 m (65 ft)
Lanes
4
Daily Traffic
23,405
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,080,000
Total Project Cost
$1,621,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.