HWY PEARL ST over WATER MONATIQUOT RIVER

.6 KM E OF WASHINGTON ST · County 021, Massachusetts · Built 1963 · 2 Lanes · 11,379 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B21013338MUNNBI
Year Built
1963
Length
10.2 m (33.5 ft)
Max Span
9.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
11,379
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$309,000
Total Project Cost
$464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.