HWY PLAIN ST over WATER MONATIQUOT RIVER
ST 37 · County 021, Massachusetts · Built 1929 · 3 Lanes · 22,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.196108, -71.004392
This bridge is in worse condition than 93.9% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 97 years old.
Nearby Bridges
ST 37 WASHNGTON ST over WATER MONATIQUOT RIVER
Built 1924
HWY JEFFERSON ST over WATER MONATIQUOT RIVER
Built 1955
HWY JW MAHAR HWY over RR BCRR SPUR ABAN
Built 1850
HWY PLAIN ST over RR MBTA
Built 1989
HWY JW MAHAR HWY over WATER MONATIQUOT RIVER
Built 1982
HWY PEARL ST over WATER MONATIQUOT RIVER
Built 1963
ST 37 WASHNGTON ST over RR MBTA/CSX
Built 1948
ST 3 over WATER MONATIQUOT RIVER
Built 1957
ST 3 over HWY UNION ST S ROTARY
Built 1957
HWY LIBERTY ST over RR MBTA
Built 1984
Bridge Details
- Structure #
- B21014361DOTNBI
- Year Built
- 1929
- Reconstructed
- 1975
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 22,900
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $842,000
- Total Project Cost
- $1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.