HWY PLAIN ST over WATER MONATIQUOT RIVER

ST 37 · County 021, Massachusetts · Built 1929 · 3 Lanes · 22,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B21014361DOTNBI
Year Built
1929
Reconstructed
1975
Length
7.9 m (25.9 ft)
Max Span
7 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
22,900
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$842,000
Total Project Cost
$1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.