US 1 SB over US 1 NB

S APPR TOBIN · County 025, Massachusetts · Built 1994 · 3 Lanes · 34,040 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
B16409927DOTNBI
Year Built
1994
Length
216.4 m (710 ft)
Max Span
24.4 m
Width
13.2 m (43.3 ft)
Lanes
3
Daily Traffic
34,040
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,596,000
Total Project Cost
$27,895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.