US 1 SB/B MYSTC U over US 1 NB/BIG MYSTIC LOWR

BIG MYSTIC UPPER · County 025, Massachusetts · Built 1950 · 3 Lanes · 41,655 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B160174X4DOTNBI
Year Built
1950
Length
464.5 m (1524 ft)
Max Span
244.1 m
Width
12.7 m (41.7 ft)
Lanes
3
Daily Traffic
41,655
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$38,339,000
Total Project Cost
$57,509,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.