US 1 NB/LOWR DECK over OTHER RELIEF

TOLL PL LOWER · County 025, Massachusetts · Built 1950 · 3 Lanes · 41,988 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B160174X1DOTNBI
Year Built
1950
Length
326.7 m (1071.9 ft)
Max Span
35.4 m
Width
12.7 m (41.7 ft)
Lanes
3
Daily Traffic
41,988
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,961,000
Total Project Cost
$40,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.